Progress images of the works being undertaken at Waterloo - August 2017
Progress images of the works being undertaken at Waterloo - August 2017
Progress images of the works being undertaken at Waterloo - August 2017
Works to restore Hungerford Bridge
Long shot of the site at Dover Sea Wall
Aerial Shot of the Dover Sea Wall site
An excavator being used at the Dover Sea Wall site to move rubble from the site onto a nearby train for removal.
An excavator being used at the Dover Sea Wall site to move rubble from the site onto a nearby train for removal.
An asbestos removal contractor in a Mobile Elevated Works Platform with additional protection from Sanctuary Zone.
Railway workers undertaking repair works to the Chelsea River Bridge.
Work group on the boat carrying out repair work to Hungerford Bridge.
Wide shot of the Hungerford Bridge
Work group on the Hungerford Bridge site.
MyZone is a personal vibrating alarm, worn inside the hard hat, alerting site workers to a real and immediate danger.
The installation of high voltage feeder cable from a moving train.
A work group having a Time Out Take Five.
Works taking place at Wandsworth Town.
Wandsworth Town closed while weekend works are taking place.
Wide shot of the Hungerford Bridge